Trusted Partner in Scrap Metal Recycling
Industrial dismantling and demolition support for businesses in Singapore. Lian Aik Enterprises coordinates manpower, equipment and transport for structures, machinery removal and site clearance, based on the agreed scope.
Tell us what needs to be removed and what must remain. Enquire about:
A clear removal list helps define the quotation. Identify items for retention, relocation or scrap recovery, and flag work that may affect surrounding areas.
From a single equipment removal to a wider industrial clearance, the work needs to fit your premises:
Agree on the removal boundaries and condition required at handover. Repairs, reinstatement and specialist materials should be discussed separately when defining the scope.
Send photos, an item list, your site address and target completion date.
Review assessment needs, removal arrangements, exclusions and quotation.
Agree on access, timing, responsibilities and the handover checklist.
Share your site photos and removal needs. We’ll advise on assessment and the next step.
Dismantling takes equipment or structures apart in sections, often to support removal or material recovery. Demolition involves breaking down structures. The appropriate approach depends on what is being removed, what must remain and the site conditions.
Costs depend on the size and installation of the items, access, manpower, lifting equipment, transport and disposal needs. Share the same item list when comparing quotations, and check whether cleaning or reinstatement is included.
Photos help with an initial review. A site visit may be needed to assess fixed machinery, restricted access, structural interfaces or a larger clearance. Send wide-view photos and close-ups so the team can advise on the next step.
Confirm the removal list, items to retain, site contact and handover requirements. Agree who will arrange the necessary approvals and have connected services safely isolated by qualified personnel. Highlight any oils, chemicals or other materials requiring separate assessment.
Suitable recovered metal may have value, but it does not automatically cover the removal cost. Confirm material ownership, assessment and weighing arrangements, and whether the scrap value is paid separately or reflected in the quotation.
The schedule depends on the quantity of equipment, access, work sequence and readiness of the site. Share your handover deadline and any shutdown windows. LAE can review the scope before discussing a suitable removal schedule.
Scrap metal recovery and industrial solutions, built on decades of operational experience.
© 2026 Lian Aik Enterprises Pte Ltd.